| Package(s) | Consultation | Status | |
National Operations Publications- Track circuit block regulations
- Absolute block regulations
- General signalling regulations
|
New Approach: Tranche 7 - General signalling, track circuit block and absolute block regulations Consultation on Tranche 7 of the New Approach, covering Rule Book module(s) TS1, TS2 & TS3.
Consultation dates: 09/02/2012 - 21/03/2012
|
Available for Comment
|
View Consultation
|
Good Practice Guides
|
RS/504 Managing Fatigue – A Good Practice Guide, issue 1, draft 1a The content of the document concerns Fatigue Management information and should be brought to the attention of Heads of Safety, Driver Managers, Human Resource Managers, Standards Managers, Safety Managers, Head of Operations, Safety and Standards Managers, Safety and Compliance Manager.
Consultation dates: 08/02/2012 - 07/03/2012
|
Available for Comment
|
View Consultation
|
Plant pack- Portable and Transportable Plant used for Infrastructure Work
|
Rail Industry Standard for Portable and Transportable Plant Used for Infrastructure Work RIS-1701-PLT covers the acceptance for use on Network Rail managed infrastructure of all new and modified portable and transportable plant used for all infrastructure related activities.
Consultation dates: 17/01/2012 - 24/02/2012
|
Available for Comment
|
View Consultation
|
Movement Authority Systems - Signal Sighting- Guidance on Signalling Positioning and Visibility
- Maintenance of Signal Visibility
- Signal Positioning and Visibility
- Positioning and Labelling of Lineside Telephones
- Signal, Operational Sign Visibility and Readability, and Provision of Lineside Telephones
- Guidance on Signal, Operational Sign Visibility and Readability, and Provision of Lineside Telephones
|
Signal, Operational Sign Visibility and Readability, and Provision of Lineside Telephones This document mandates the requirements for assessing and maintaining signal or operational sign visibility and readability.
Consultation dates: 13/01/2012 - 17/02/2012
|
Available for Comment
|
View Consultation
|
National Operations Publications
|
Recovery from railway emergency calls using GSM-R RSSB response to consultation on proposal 11/031 concerning recovery from railway emergency calls using GSM-R which affects Rule Book module TW1 Preparation and Movement of Trains: General.
Consultation dates: 14/12/2011 - 18/01/2012 Response date: 08/02/2012
|
RSSB Response Available
|
View Response
|