Welcome to the RSSB Consultation and Stakeholder Register.

This page is the ‘Consultation’ area where RSSB list details of all standards (and associated document) consultations managed by RSSB that are currently underway or recently completed.

This ‘forthcoming consultations(updated 22 February 2012) link takes you to a PDF document highlighting proposed consultations due to be published on this site over the next 6 months.

The Stakeholder Register contains a list of stakeholders and identifies, for each stakeholder, the RSSB-managed documents they will be consulted about when changes are proposed.

RSSB uses the Stakeholder Register to identify who shall be consulted or notified when changes are happening to particular documents, according to the preferences declared by the stakeholders. This reflects the targeted consultation requirements set out in the RGS Code.

The RGS Code also requires open access consultation. Therefore anyone can view the Consultation Packs on this system and forward their comments using the questionnaires provided.

If you have any questions, comments or queries about using the system then please email consultation@rssb.co.uk.

Stakeholder register


   View the stakeholder register

List of consultations

  Keyword Status  
Filter by: 
Hint: If you would like to search for an exact consultation pack code then please enclose it in quotation marks.
Sort by:  Consultation | Start date | End date | Response date | Status

showing 1 - 5 of 65


Package(s)ConsultationStatus 
Rolling Stock pack
  • Requirements for Railway Vehicle Structures
Reinstate coupling measure
During the production of the UK national reference document referred to in Article 27 of Directive 2008/57/EC (the ‘Interoperability Directive’), it has been identified that there is currently no national technical rule for the GB mainline network against parameter 9.5.1.1, ‘Staff access for coupling/uncoupling’. A new requirement for staff access for coupling and uncoupling has therefore been developed.

Consultation dates: 22/02/2012 - 22/02/2012
Response date:      22/02/2012
RSSB Response Available View Response
Updating stakeholder details
Request for Consultation and Stakeholder Register members to update their personal details.

Consultation dates: 15/02/2012 - 29/02/2012
Available for Comment View Consultation
National Operations Publications
  • Track circuit block regulations
  • Absolute block regulations
  • General signalling regulations
New Approach: Tranche 7 - General signalling, track circuit block and absolute block regulations
Consultation on Tranche 7 of the New Approach, covering Rule Book module(s) TS1, TS2 & TS3.

Consultation dates: 09/02/2012 - 21/03/2012
Available for Comment View Consultation
Good Practice Guides
  • Managing Fatigue
RS/504 Managing Fatigue – A Good Practice Guide, issue 1, draft 1a
The content of the document concerns Fatigue Management information and should be brought to the attention of Heads of Safety, Driver Managers, Human Resource Managers, Standards Managers, Safety Managers, Head of Operations, Safety and Standards Managers, Safety and Compliance Manager.

Consultation dates: 08/02/2012 - 07/03/2012
Available for Comment View Consultation
Plant pack
  • Portable and Transportable Plant used for Infrastructure Work
Rail Industry Standard for Portable and Transportable Plant Used for Infrastructure Work
RIS-1701-PLT covers the acceptance for use on Network Rail managed infrastructure of all new and modified portable and transportable plant used for all infrastructure related activities.

Consultation dates: 17/01/2012 - 24/02/2012
Available for Comment View Consultation
12345...>>