Welcome to the RSSB Consultation and Stakeholder Register.

The Consultation area contains details on all consultations managed by RSSB that are currently underway or recently completed.

The Stakeholder Register contains a list of stakeholders and identifies, for each stakeholder, the RSSB-managed documents they will be consulted about when changes are proposed.

RSSB uses the Stakeholder Register to identify who shall be consulted or notified when changes are happening to particular documents, according to the preferences declared by the stakeholders. This reflects the targeted consultation requirements set out in the RGS Code.

The RGS Code also requires open access consultation. Therefore anyone can view the Consultation Packs on this system and forward their comments using the questionnaires provided.

If you have any questions, comments or queries about using the system then please email consultation@rssb.co.uk.

Stakeholder register


   View the stakeholder register

List of consultations

  Keyword Status  
Filter by: 
Hint: If you would like to search for an exact consultation pack code then please enclose it in quotation marks.
Sort by:  Consultation | Start date | End date | Response date | Status

showing 1 - 5 of 42


Package(s)ConsultationStatus 
Track
  • Track System Requirements
GC/RT5021 Track System Requirements
Small scale change, replaces issue three. Sections 1.2.1, 2.11.6, 2.11.7, 2.11.8 and 4.8.1.2 revised. Section 4.2 deleted (requirement withdrawn).

Consultation dates: 29/06/2009 - 31/07/2009
Available for Comment View Consultation
National Operations Publications
  • Fundamental Operating Principles
Consultation on the proposed GE/RT8000/FOP Fundamental Operating Principles
Consultation on the proposed RSSB industry Operational Principles.

Consultation dates: 26/06/2009 - 24/07/2009
Available for Comment View Consultation
Possession Only Rail Vehicles
  • Engineering Acceptance of Possession - Only Rail Vehicles and Associated Equipment
RIS-1530-PLT
Issue Two has already been consulted on. However the document has changed significantly so is being issued for a second shortened period of targeted industry consultation, which is limited to three weeks. The consultation documentation includes the response to the comments made during the first period of consultation.

Consultation dates: 25/06/2009 - 17/07/2009
Available for Comment View Consultation
National Operations Publications
  • Amendments module
GE/RT8000/S5 - TW7
Consultation on the amendments of GE/RT8000/S5 - TW7 - To be published within issue 9 of the (AM) Amendments Module

Consultation dates: 12/06/2009 - 02/07/2009
Awaiting RSSB Response View Consultation
National Operations Publications
  • Amendments module
GE/RT8000/SP
Consultation on the amendment of GE/RT8000/SP - To be published within issue 9 of the (AM) Amendments Module

Consultation dates: 11/06/2009 - 01/07/2009
Awaiting RSSB Response View Consultation
12345...>>