Welcome to the RSSB Consultation and Stakeholder Register.
The Consultation area contains details on all consultations managed by RSSB that are currently underway or recently completed.
The Stakeholder Register contains a list of stakeholders and identifies, for each stakeholder, the RSSB-managed documents they will be consulted about when changes are proposed.
RSSB uses the Stakeholder Register to identify who shall be consulted or notified when changes are happening to particular documents, according to the preferences declared by the stakeholders. This reflects the targeted consultation requirements set out in the RGS Code.
The RGS Code also requires open access consultation. Therefore anyone can view the Consultation Packs on this system and forward their comments using the questionnaires provided.
If you have any questions, comments or queries about using the system then please email consultation@rssb.co.uk.
List of consultations
Refreshing Consultation list

Please Wait...
| Package(s) | Consultation | Status | |
Track- Track System Requirements
|
GC/RT5021 Track System Requirements Small scale change, replaces issue three. Sections 1.2.1, 2.11.6, 2.11.7, 2.11.8 and 4.8.1.2 revised. Section 4.2 deleted (requirement withdrawn).
Consultation dates: 29/06/2009 - 31/07/2009
|
Available for Comment
|
View Consultation
|
National Operations Publications- Fundamental Operating Principles
|
Consultation on the proposed GE/RT8000/FOP Fundamental Operating Principles Consultation on the proposed RSSB industry Operational Principles.
Consultation dates: 26/06/2009 - 24/07/2009
|
Available for Comment
|
View Consultation
|
Possession Only Rail Vehicles- Engineering Acceptance of Possession - Only Rail Vehicles and Associated Equipment
|
RIS-1530-PLT Issue Two has already been consulted on. However the document has changed significantly so is being issued for a second shortened period of targeted industry consultation, which is limited to three weeks. The consultation documentation includes the response to the comments made during the first period of consultation.
Consultation dates: 25/06/2009 - 17/07/2009
|
Available for Comment
|
View Consultation
|
|
National Operations Publications
|
GE/RT8000/S5 - TW7 Consultation on the amendments of GE/RT8000/S5 - TW7 - To be published within issue 9 of the (AM) Amendments Module
Consultation dates: 12/06/2009 - 02/07/2009
|
Awaiting RSSB Response
|
View Consultation
|
|
National Operations Publications
|
GE/RT8000/SP Consultation on the amendment of GE/RT8000/SP - To be published within issue 9 of the (AM) Amendments Module
Consultation dates: 11/06/2009 - 01/07/2009
|
Awaiting RSSB Response
|
View Consultation
|